Installation and maintenance work
IKP Service Oy offers comprehensive installation, maintenance and repair services for various industrial needs. We operate flexibly according to the customer's schedules and production - around the clock, every day of the year.

We have managed to grow our operations successfully over the years, and in 2015 we separated our maintenance and repair services into our own company, IKP Service Oy. With the company reorganization, we are able to serve our customers even better and develop our service products even more sharply.
We provide our customers with complete installation, repair and maintenance services, from planning and scheduling to quotation and implementation. We also manage projects according to the customer's needs.
Examples of installation, repair and maintenance work
- Complete deliveries of factories
- Conveyors, unloaders and other machine assembly work
- Installations and maintenance of various drums and furnaces
- Installation and maintenance of radiators and coolers
- Installation of support frame sections and toothed frames
- Bearing installation and replacement work
- Installation and alignment services for electric motors, gearboxes, pumps, fans, etc.
- Steel structures
.jpeg)
24/7 factory services
IKP Service Oy is a partner that is available 24/7.
Sometimes a situation arises where a factory has problems in production that can prevent production from progressing as planned or even stop production altogether. IKP is a partner that offers 24/7 assistance and repairs, maintenance, installations and various measurement services with experience and professionalism.
When you need fast, professional installation or repair service, IKP Service Oy is the solution - contact us!
Installation work
We offer a wide range of industrial installation services, such as installations of machines, conveyors, drums, furnaces, coolers and steel structures. Our services cover the entire project from design to implementation – reliably and professionally.




oven and drum installations
We specialize in the installation and maintenance of lime kilns. Our long experience guarantees a high-quality and safe end result – we manage the entire process from start to finish according to the customer's needs.
Project management
IKP's project management ensures that installation and maintenance projects stay on schedule, within budget and of high quality. We take responsibility for the entire project or flexibly support the customer's own organization as needed.



onsite services
We offer maintenance and installation services directly at the customer's premises. Our fast-reacting teams carry out repairs and maintenance work on site, keeping production running as uninterrupted as possible.
logistics services
IKP takes care of project logistics efficiently and on schedule. We ensure timely deliveries and material flow management so that construction sites can focus on the implementation itself without unnecessary interruptions.

contact us
Contact us – we will respond with iron-clad professionalism
Our operations consist of Iin Konepaja Oy, which specializes in the manufacture of steel products, and IKP Service Oy, which offers maintenance and repair services. Together, we form a versatile and competent partner for industrial needs – from individual jobs to larger projects.
It is important to us that the work is done flexibly, quickly and with high quality, but above all responsibly. We operate with a long-term perspective and invest in environmentally friendly choices throughout the production chain. We want to be part of building an industry that lasts and consumes less.
We are proud of our Finnishness and local roots, as our roots extend back to Ii in 1980. We know our industry, our customers, and the Arctic conditions – and we do our work with the precision and consideration that comes with it.
Sustainable industry is born from actions – contact us and let's start a collaboration that takes both business and the environment into account.
Sustainable industry is born from actions – contact us and let's start a collaboration that takes both business and the environment into account.